← Back to Brewed Up Insights
33%

more battery built at Bikaner than it can deliver

ACME Solar's battery total counts power it cannot deliver

Companies No. 251 21 November 2026 · 2 min read · By

ACME Solar said on 20 November that its new batteries for Tata Power hold 160.48 MWh but can deliver only 148.645 MWh. At its Bikaner site, it built 33% more than it can deliver.

ACME builds solar farms and grid batteries in Rajasthan and sells their power on long contracts. A battery stores power and sells it later, when it is most wanted.

So a battery sells all it holds? No. ACME's slides say it drains its batteries to only about 95% of what they hold, and gets back about 89% of the power it puts in. So it builds extra.

For the whole Tata contract it plans 220 MWh built to deliver 209 MWh: exactly that 95%. Its main battery in the same village is 8% bigger than what it can deliver.

Bikaner, ACME's first contract to supply power at off-peak hours, is the outlier: a quarter of what it built there sits on top of what it can deliver. The filings do not say why.

That gap is inside ACME's headline numbers. On 16 September it announced 300 MWh of new storage at Bikaner, taking its total to 4.16 GWh. A filing the next day put the same block at 214.52 MWh it can deliver.

Its slides now call 5.24 GWh its installed battery capacity: what ACME built, not what its contracts promise to deliver. So each GWh added to that total brings less than a GWh of power to sell. More on who makes money in solar and wind in the Macro Brew.

ACME's Bikaner battery is a third bigger than it can deliver

MWh, built and deliverable, November 2026

Bars for 3 ACME Solar batteries in Rajasthan: the Tata Power block at Neemri, 160 MWh built and 149 MWh it can deliver; the main Neemri battery, 792 MWh built and 734 MWh; Bikaner, 1,321 MWh built and 991 MWh.

MWH

BuiltCan deliver

33% more built than it can deliver

ACME Solar Holdings, BSE filings of 17 and 20 November 2026 · To 17 Nov (Bikaner) and 20 Nov 2026 (Neemri)

ACME's 300 MWh Bikaner block can deliver 214.52 MWh

MWh, September 2026

MWH

  • Can deliver214.52 71.5%
  • Built on top85.48 28.5%
A bar of the 300 MWh battery block ACME Solar announced at Bikaner, split into 214.52 MWh it can deliver and 85.48 MWh built on top.

ACME Solar Holdings, BSE press release of 16 Sep 2026 and filing of 17 Sep 2026 · Phase 1 of the Bikaner battery, September 2026

Sources