ACME's 300 MWh Bikaner block can deliver 214.52 MWh
MWh, September 2026
ACME's 300 MWh Bikaner block can deliver 214.52 MWh
MWh, September 2026
MWH
- Can deliver214.52 71.5%
- Built on top85.48 28.5%
ACME Solar Holdings, BSE press release of 16 Sep 2026 and filing of 17 Sep 2026 · Phase 1 of the Bikaner battery, September 2026
Share this chart
The numbers
Embed it on your site
The code carries a credit line that links back to this page. Keep it with the chart.